BMU2: различия между версиями
AlexHel (обсуждение | вклад) Нет описания правки |
AlexHel (обсуждение | вклад) Нет описания правки |
||
| Строка 15: | Строка 15: | ||
The hand selection time for row is the functon of SKU, position number and quantity of items per row. | The hand selection time for row is the functon of SKU, position number and quantity of items per row. | ||
$$G(sku,qty, zone, position)=3600/Productivity | $$G(sku,qty, zone, position)=3600/Productivity+comfort+scan*T_sc$$ | ||
$T_sc=3$ - scanning time. | $T_sc=3$ - scanning time. | ||
For comfort we will use the listed times: | |||
AA 5 | |||
AB 10 | |||
AC 11,25 | |||
BA 12,5 | |||
BC 15 | |||
CA 17,5 | |||
CC 20 | |||
Д 22,5 | |||
ST 50 | |||
OБ 150 | |||
and is tabulated in our case. | and is tabulated in our case. | ||
Версия от 09:25, 31 октября 2020
We have the conveyor with $10\le M \le 100$ stations for hand selection of products items to boxes. The volune of box is $V_b=0,034$.
List of sku is in SKU.xlsx file.
Each box moves from the beginning to the end of conveyor throu the set of stations $Z=\{z_1, z_2 dots, z_M\}$.
Each station works with zone, including the set of positions $N_m$.
The structure of store is in ZONES+positions.xlsx file
Each position is for one type of goods.
The $sku$ coluld be assignned with position only if position is empty.
The hand selection time for row is the functon of SKU, position number and quantity of items per row.
$$G(sku,qty, zone, position)=3600/Productivity+comfort+scan*T_sc$$
$T_sc=3$ - scanning time.
For comfort we will use the listed times:
AA 5 AB 10 AC 11,25 BA 12,5 BC 15 CA 17,5 CC 20 Д 22,5 ST 50 OБ 150
and is tabulated in our case.
Each zone has $N_z$ positions. We will assume that each position coukd be loaded from store any time we need in.
The source data is the set of rows per day:
sku - good type
qty - quantity
datetime - dte and time
order - номер заказа
Box moves with $v=0.6m/s$ from one section to another.
The distance between the stations is $a=8m$.
We should propose the input goods flow routing to zones and positions to minimize the time $T$ for daily hand selection.
It is necessary to estimate the mean and variance.
The model should be described in latex as an instruction and description.